General Information
This subject develops a mature understanding of the management of the processes associated with the production of contract documents, particularly those that are integrated with cost management. There is an emphasis on emerging and innovative technologies and techniques that integrate activities such as complex building measurement with a range of information management tools. Strong links are developed with the construction industry through guest lectures and case studies of projects presented by industry professionals. Related aspects of professional practice are explored. Students are required to research and write a significant report on an aspect of contemporary industry practice.
-
Details
Academic unit: Faculty of Society & Design Subject code: SSUD13-313 Subject title: Integrated Measurement and Professional Practice Subject level: Undergraduate Semester/Year: September 2021 Credit points: 10.000 -
Delivery & attendance
Timetable: https://bond.edu.au/timetable Delivery mode: Standard Workload items: - Seminar: x12 (Total hours: 36) - Educator directed digital technology instruction.
- Personal Study Hours: x12 (Total hours: 84) - Recommended Study Hours
Attendance and learning activities: As successful completion of this subject is heavily dependent on participation during all scheduled sessions, attendance will be monitored. Most sessions build on the content of the previous one. It is difficult for a student to recover if a session is missed. It is the responsibility of the student to catch up on any content missed and to complete set work outside class. It is also necessary for students to engage proactively and contribute positively in discussions, analyses and case studies. The assessments are an important part of developing the knowledge and understanding required to fulfil the minimum requirements of this subject. In addition to “remote” face-to-face contact time, students should plan to spend a minimum of 84 hours undertaking preparation/out of class work/personal study for this subject. This is intended as a general guide only for workload planning. More time may be required depending on the student's comprehension of the content delivered in class and aptitude for the subject. Please note that subsequent subjects assume the student has a full understanding of this subject - this content will not be repeated. -
Resources
Prescribed resources: No Prescribed resources.
After enrolment, students can check the Books and Tools area in iLearn for the full Resource List.iLearn@Bond & Email: iLearn@Bond is the online learning environment at Bond University and is used to provide access to subject materials, lecture recordings and detailed subject information regarding the subject curriculum, assessment and timing. Both iLearn and the Student Email facility are used to provide important subject notifications. Additionally, official correspondence from the University will be forwarded to students’ Bond email account and must be monitored by the student. To access these services, log on to the Student Portal from the Bond University website as www.bond.edu.au
Academic unit: | Faculty of Society & Design |
---|---|
Subject code: | SSUD13-313 |
Subject title: | Integrated Measurement and Professional Practice |
Subject level: | Undergraduate |
Semester/Year: | September 2021 |
Credit points: | 10.000 |
Timetable: | https://bond.edu.au/timetable |
---|---|
Delivery mode: | Standard |
Workload items: |
|
Attendance and learning activities: | As successful completion of this subject is heavily dependent on participation during all scheduled sessions, attendance will be monitored. Most sessions build on the content of the previous one. It is difficult for a student to recover if a session is missed. It is the responsibility of the student to catch up on any content missed and to complete set work outside class. It is also necessary for students to engage proactively and contribute positively in discussions, analyses and case studies. The assessments are an important part of developing the knowledge and understanding required to fulfil the minimum requirements of this subject. In addition to “remote” face-to-face contact time, students should plan to spend a minimum of 84 hours undertaking preparation/out of class work/personal study for this subject. This is intended as a general guide only for workload planning. More time may be required depending on the student's comprehension of the content delivered in class and aptitude for the subject. Please note that subsequent subjects assume the student has a full understanding of this subject - this content will not be repeated. |
Prescribed resources: | No Prescribed resources. After enrolment, students can check the Books and Tools area in iLearn for the full Resource List. |
---|---|
iLearn@Bond & Email: | iLearn@Bond is the online learning environment at Bond University and is used to provide access to subject materials, lecture recordings and detailed subject information regarding the subject curriculum, assessment and timing. Both iLearn and the Student Email facility are used to provide important subject notifications. Additionally, official correspondence from the University will be forwarded to students’ Bond email account and must be monitored by the student. To access these services, log on to the Student Portal from the Bond University website as www.bond.edu.au |
Enrolment requirements
Requisites: |
Nil |
---|---|
Assumed knowledge: |
Assumed knowledge is the minimum level of knowledge of a subject area that students are assumed to have acquired through previous study. It is the responsibility of students to ensure they meet the assumed knowledge expectations of the subject. Students who do not possess this prior knowledge are strongly recommended against enrolling and do so at their own risk. No concessions will be made for students’ lack of prior knowledge.
|
Restrictions: |
Nil |
Assurance of learning
Assurance of Learning means that universities take responsibility for creating, monitoring and updating curriculum, teaching and assessment so that students graduate with the knowledge, skills and attributes they need for employability and/or further study.
At Bond University, we carefully develop subject and program outcomes to ensure that student learning in each subject contributes to the whole student experience. Students are encouraged to carefully read and consider subject and program outcomes as combined elements.
Program Learning Outcomes (PLOs)
Program Learning Outcomes provide a broad and measurable set of standards that incorporate a range of knowledge and skills that will be achieved on completion of the program. If you are undertaking this subject as part of a degree program, you should refer to the relevant degree program outcomes and graduate attributes as they relate to this subject.
Subject Learning Outcomes (SLOs)
On successful completion of this subject the learner will be able to:
- Apply the principles of measurement to more complex building measurement using digital technologies and tools.
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
- Plan, implement and undertake independent research to investigate a detailed question and present the results of that research in the form of a written professional report with appropriate critical appraisal of the outcomes.
- Provide preliminary advice to clients on the adoption of new management technologies and tools in the process of building procurement.
Generative Artificial Intelligence in Assessment
The University acknowledges that Generative Artificial Intelligence (Gen-AI) tools are an important facet of contemporary life. Their use in assessment is considered in line with students’ development of the skills and knowledge which demonstrate learning outcomes and underpin study and career success. Instructions on the use of Gen-AI are given for each assessment task; it is your responsibility to adhere to these instructions.
-
Assessment details
Type Task % Timing* Outcomes assessed Take-home Examination Take home Examination 40.00% Final Examination Period 1,2,4 *Guided Practical Revit Modelling 20.00% Week 6 1,2 Written Report§ Research project 40.00% Week 12 2,3 - § Indicates group/teamwork-based assessment
- * Assessment timing is indicative of the week that the assessment is due or begins (where conducted over multiple weeks), and is based on the standard University academic calendar
- C = Students must reach a level of competency to successfully complete this assessment.
-
Assessment criteria
Assessment criteria
High Distinction 85-100 Outstanding or exemplary performance in the following areas: interpretative ability; intellectual initiative in response to questions; mastery of the skills required by the subject, general levels of knowledge and analytic ability or clear thinking. Distinction 75-84 Usually awarded to students whose performance goes well beyond the minimum requirements set for tasks required in assessment, and who perform well in most of the above areas. Credit 65-74 Usually awarded to students whose performance is considered to go beyond the minimum requirements for work set for assessment. Assessable work is typically characterised by a strong performance in some of the capacities listed above. Pass 50-64 Usually awarded to students whose performance meets the requirements set for work provided for assessment. Fail 0-49 Usually awarded to students whose performance is not considered to meet the minimum requirements set for particular tasks. The fail grade may be a result of insufficient preparation, of inattention to assignment guidelines or lack of academic ability. A frequent cause of failure is lack of attention to subject or assignment guidelines. Quality assurance
For the purposes of quality assurance, Bond University conducts an evaluation process to measure and document student assessment as evidence of the extent to which program and subject learning outcomes are achieved. Some examples of student work will be retained for potential research and quality auditing purposes only. Any student work used will be treated confidentially and no student grades will be affected.
Type | Task | % | Timing* | Outcomes assessed |
---|---|---|---|---|
Take-home Examination | Take home Examination | 40.00% | Final Examination Period | 1,2,4 |
*Guided Practical | Revit Modelling | 20.00% | Week 6 | 1,2 |
Written Report§ | Research project | 40.00% | Week 12 | 2,3 |
- § Indicates group/teamwork-based assessment
- * Assessment timing is indicative of the week that the assessment is due or begins (where conducted over multiple weeks), and is based on the standard University academic calendar
- C = Students must reach a level of competency to successfully complete this assessment.
Assessment criteria
High Distinction | 85-100 | Outstanding or exemplary performance in the following areas: interpretative ability; intellectual initiative in response to questions; mastery of the skills required by the subject, general levels of knowledge and analytic ability or clear thinking. |
---|---|---|
Distinction | 75-84 | Usually awarded to students whose performance goes well beyond the minimum requirements set for tasks required in assessment, and who perform well in most of the above areas. |
Credit | 65-74 | Usually awarded to students whose performance is considered to go beyond the minimum requirements for work set for assessment. Assessable work is typically characterised by a strong performance in some of the capacities listed above. |
Pass | 50-64 | Usually awarded to students whose performance meets the requirements set for work provided for assessment. |
Fail | 0-49 | Usually awarded to students whose performance is not considered to meet the minimum requirements set for particular tasks. The fail grade may be a result of insufficient preparation, of inattention to assignment guidelines or lack of academic ability. A frequent cause of failure is lack of attention to subject or assignment guidelines. |
Quality assurance
For the purposes of quality assurance, Bond University conducts an evaluation process to measure and document student assessment as evidence of the extent to which program and subject learning outcomes are achieved. Some examples of student work will be retained for potential research and quality auditing purposes only. Any student work used will be treated confidentially and no student grades will be affected.
Study Information
Submission procedures
Students must check the iLearn@Bond subject site for detailed assessment information and submission procedures.
Policy on late submission and extensions
A student who has not established a basis for an extension in compliance with University and Faculty policy either by 1) not applying before the assessment due date or 2) by having an application rejected due to failure to show a justifiable cause for an extension, will receive a penalty on assessment submitted after its due date. The penalty will be 10% of marks awarded to that assessment for every day late, with the first day counted after the required submission time has passed. No assessment will be accepted for consideration seven calendar days after the due date. Where a student has been granted an extension, the late penalty starts from the new due date and time set out in the extension.
Academic Integrity
University’s Academic Integrity Policy defines plagiarism as the act of misrepresenting as one’s own original work: another’s ideas, interpretations, words, or creative works; and/or one’s own previous ideas, interpretations, words, or creative work without acknowledging that it was used previously (i.e., self-plagiarism). The University considers the act of plagiarising to be a breach of the Student Conduct Code and, therefore, subject to the Discipline Regulations which provide for a range of penalties including the reduction of marks or grades, fines and suspension from the University.
Bond University utilises Originality Reporting software to inform academic integrity.Feedback on assessment
Feedback on assessment will be provided to students within two weeks of the assessment submission due date, as per the Assessment Policy.
Accessibility and Inclusion Support
If you have a disability, illness, injury or health condition that impacts your capacity to complete studies, exams or assessment tasks, it is important you let us know your special requirements, early in the semester. Students will need to make an application for support and submit it with recent, comprehensive documentation at an appointment with a Disability Officer. Students with a disability are encouraged to contact the Disability Office at the earliest possible time, to meet staff and learn about the services available to meet your specific needs. Please note that late notification or failure to disclose your disability can be to your disadvantage as the University cannot guarantee support under such circumstances.
Additional subject information
Subject curriculum
-
Introduction to IMPP
Overview of the subject scope and focus; introduction to integrated measurement.
SLOs included
- Apply the principles of measurement to more complex building measurement using digital technologies and tools.
-
Standard methods of measurement
Overview of the standard methods of measurement and difference with approach to integrated measurement; linking integrated measurement with pricing.
SLOs included
- Apply the principles of measurement to more complex building measurement using digital technologies and tools.
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
-
Introduction to Research Process
Introduction to technical report writing.
SLOs included
- Plan, implement and undertake independent research to investigate a detailed question and present the results of that research in the form of a written professional report with appropriate critical appraisal of the outcomes.
-
BIM 1 Architectural Representation
Introduction to Building Information Modelling (BIM)
SLOs included
- Plan, implement and undertake independent research to investigate a detailed question and present the results of that research in the form of a written professional report with appropriate critical appraisal of the outcomes.
-
BIM 2 History and Overview
The evolution of BIM and benefits for Architecture, Engineering and Construction.
SLOs included
- Plan, implement and undertake independent research to investigate a detailed question and present the results of that research in the form of a written professional report with appropriate critical appraisal of the outcomes.
- Provide preliminary advice to clients on the adoption of new management technologies and tools in the process of building procurement.
-
BIM 3 Construction Modelling
Introduction to 3D and 5D building modelling and model-based documentation.
SLOs included
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
-
BIM 4 Collaboration
BIM as a vehicle for optimised communication and collaboration among the project team.
SLOs included
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
- Provide preliminary advice to clients on the adoption of new management technologies and tools in the process of building procurement.
-
BIM 5 Processes
Introduction to BIM process for information sharing through all phases of the building life-cycle.
SLOs included
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
- Provide preliminary advice to clients on the adoption of new management technologies and tools in the process of building procurement.
-
Builders Bills
Integrated measurement approach to the preparation and pricing of builders bill for tendering purposes.
SLOs included
- Apply the principles of measurement to more complex building measurement using digital technologies and tools.
- Provide preliminary advice to clients on the adoption of new management technologies and tools in the process of building procurement.
-
Design Documentation
Assessment of the quality of design and documentation processes.
SLOs included
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
-
Estimating and Risk
The implications of risk management in the estimating process.
SLOs included
- Apply the principles of measurement to more complex building measurement using digital technologies and tools.
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
-
BIM Return on Investment
The benefits and barriers to BIM uptake in the construction industry.
SLOs included
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
- Provide preliminary advice to clients on the adoption of new management technologies and tools in the process of building procurement.
-
Revit Modelling
In-class and or online 3D building modelling sessions and assessment.
SLOs included
- Apply the principles of measurement to more complex building measurement using digital technologies and tools.
- Analyse and critically evaluate industry methods and practices associated with the production and use of contract documentation and discuss these in the context of established and emerging professional practice.
- Provide preliminary advice to clients on the adoption of new management technologies and tools in the process of building procurement.